dot
 
     
 
dot Works Process
  Case Studies
Works : Works Process  
 

STAGE I : PRELIMINARY DESIGN

  • To undertake a detailed survey of the proposed site
  • To suggest ideas and concepts to client in order to develop an image for the interior to enhance the products
  • To prepare the preliminary plans
    pointlayout plan
    pointzoning plan
  • To prepare rough visualization sketches or perspective drawing
  • To submit the preliminary plans and quotation to the client obtain their approval and signature prior to proceeding to stage II
 

STAGE II : DESIGN DEVELOPMENT AND WORKING DRAWING

  • Base upon the above preliminary drawings approved by the client, then develop comprehensive working drawing
  • To prepare project time schedule and color scheme for client approval
  • To submit design drawings to the client and obtain their approval
    pointfloor plan, ceiling plan
    pointelevation drawing and detail drawing
  • Submission of E&M drawing to building management office for approval
 

STAGE III : WORKING PROCEDURE OF THE PROJECT

  • Take possession of site
  • Setting out at site
  • Checking of actual size of site with client
  • Construction of fit-out work and furniture
  • Purchase necessary material according to client selection
  • Co-ordinate or site meeting with building nominated sub-contractor
  • Arrangement of existing furniture
 

STAGE IV : AFTER SALES SERVICE

  • Hand over the site to client after completed of job
  • Provide maintenance service to client while defect arise
  • Supervise our labour and co-ordinate with nominated building sub-contractor of carry out any other additional work
 
辦公室室內設計|寫字樓裝修設計|辦公室裝修|傢俬訂做|家居裝修|住宅裝修|商鋪裝修|Interior Design|室內設計
Design: Home Design|Office Design|Residence Design|Fit Furniture|Decorative Works|Interior Design|
網站地圖 | 友情連結 | XML